Operations Wallet (Presale)
Project wallet for presale operations/administration. Not for contributions. Contributions (when active) are made exclusively via the presale contract.
Official wallets, contracts and proofs for GFC on Base. This page is the Single Source of Truth. Verify addresses only here, in the Whitepaper, and via BaseScan.
Conflict rule: This portal takes precedence. Changes are dated in the changelog and additionally versioned in the repository (commit/release link).
| Item | Value | Status |
|---|---|---|
| Chain | Base (8453) | active |
| Token Contract | 0xCE844237ADbf4c31056eba438b32b7fa8B90d0F2 | active |
| Presale Contract (V2) | 0x645b3825afff74c5c275fbf531de957d8e9bc2f2 | deployed (disabled) |
| Presale active | No (Start: 02 Feb 2026, 18:00 CET) | planned |
| Presale period | 02 Feb 2026, 18:00 CET → 16 Mar 2026, 18:00 CET | planned |
| Accepted Assets | ETH • USDC • DAI (on Base) | planned |
Project wallet for presale operations/administration. Not for contributions. Contributions (when active) are made exclusively via the presale contract.
Wallet for charity/impact flows (separate from the planned Foundation Vault multi-sig).
Core team/operations – only in accordance with published rules and documentation.
Project development, infrastructure, communications. Details: Whitepaper/repo (versioned).
Preparation for initial LP setup after the presale (transactions will be documented on-chain).
Staking/rewards pool (parameters will be published as a versioned update after audit).
Important notice: Only the addresses linked here and in the Whitepaper are valid for GFC. Never send funds to “new” addresses from DMs, comments, or forums.
Note: Technical details and parameters are additionally documented in the versioned Whitepaper/repository.
The contract is already deployed, but disabled until the official start (02 Feb 2026, 18:00 CET). Before launch, contributions are not possible. Any interaction outside the presale UI is not considered participation.
Transparency note: Presale funds remain in the contract (when active) until the softcap is reached; afterwards, withdrawals are possible according to the published rules (traceable on-chain). Until launch, contributions are disabled.
Details on timelines, rules, and security principles: Whitepaper (versioned).
Target structure: community voting, verified payouts, and traceable funding flows via multi-signature wallets. Address(es) will be published here after deployment and documented in the repository.
Status: Not deployed yet. Once live, the official address including the BaseScan link will appear here.
Goal: quarterly reports as well as machine-readable exports (CSV/JSON), so third parties can independently analyze transactions and grants.
Once the transparency repository and data pipelines are in place, downloads and examples will be linked here.
Rule: With every change, additionally link the repository commit/release (versioning).
Have you seen a potential scam, found an inconsistency, or want an official verification? Email us at:
When in doubt, please include the BaseScan link or TX hash — do not rely on screenshots as the only source.